PDA

View Full Version : Colombo port expansion plan


hemalsilva
05-08-2007, 12:41 PM
Colombo port expansion plan

Project Fact Sheet:

• Two breakwaters, 5 km and 1 km in length
• Dredging of harbour channel to 20m depth estimated volume being 13.6 million cubic metres
• first terminal will be 1200m in length, sufficient for 3 x 400m berths
• construction tender expected to be awarded by July 2007; construction period is 39 months
• Phase 1 includes breakwater and 3 terminals
• Phase 2 includes an extension of the breakwater and one more terminal

http://www.lbo.lk/newsimages/Colombo%20Port%20Expansion%20Project%20Model.jpg

http://www.slpa.lk/expansionproject/images/Container_traffic_map.jpg

http://www.slpa.lk/expansionproject/images/n3.jpg

FULL STORY

http://www.lbo.lk/fullstory.php?newsID=2029092296&no_view=1&SEARCH_TERM=7

saraprobe
05-08-2007, 01:11 PM
All the info@

http://www.skyscrapercity.com/forumdisplay.php?s=&forumid=759